Buildings with a better economic value
Increasing population and urbanization in the world: growing rate of construction, need to be able to adapt and build quickly to meet the population's needs.
Did you know?
Share of operations and maintenance in total building costs over 30 years
Urban population growth by 2050
- Increasing population and urbanization in the world: growing rate of construction, need to be able to adapt and build quickly to meet the population's needs
- Cost is a driver at all stages of the building's lifecycle
- At Saint-Gobain: we want to provide solutions to assist stakeholders at all stages
Boosting productivity
-
7-15% of the total cost of the building is cost of architects in design phase
-
Before the construction is completed, need to optimize the process
- 3 main drivers:
- Efficiency at the design stage of the building: bringing solutions, services and documents to ease the work of the different stakeholders in the conception of a new building
- Efficiency of the construction process: enable quicker completion of the construction, by better management on site, conformity with standards and technical approval, ...
- Optimized cost of installation: reduced installation time, less accessories, solutions easier to install and to adapt to real jobsite configuration, ...
Improving cost of ownership
- 3 main drivers:
- Optimize operating cost: limit the impact of external negative incidents by increasing protection and early detection of events, design builsings easy to repair, use easy-to-maintain solutions, ..
- Efficiency at the end-of-life of the building: optimize demolition and deconstruction, enable re-use of building parts, minimize landfill and other disposal costs
- Increased value of property: from the design stage, favor durable construction with low energy consumption, low maintenance and easy renovation
How we contribute
-
Saint-Gobain solutions are available to take action at all lifecycle stages:
-
Design stage: tools and documents to support designers, BIM objects
-
Construction stage: lightweight construction systems, off-site manufacturing, logistics services
-
Operating stage: safe solutions, easy to maintain, long-lasting solutions
-
End-of-life: solutions easy to deconstruct, dismount or recycle ; recycling services